Section 3 – the big wall

Almost finished the prep/primer to the big wall today. There’s just a small section near the street that I didn’t want to do as I need to “fix” the previous owners render crack “repairs”. I’ll put crack repairs in another post.

This section is by far the biggest wall and I’m looking forward to hitting it with colour, but I need to fix the render cracks first.

Section 3 the big wall (right side of picture), and completed Section 2 (left side of picture)Photo shows completed Section 2 (alcove near kitchen), and lower part of Section 3 painted with top coat. The very far end is not yet primed but you can hardly see that in the picture.

.

.

.

.

Previous article

Hit the high walls

Next article

Repairing the repairs