Section 3 – the big wall
Almost finished the prep/primer to the big wall today. There’s just a small section near the street that I didn’t want to do as I need to “fix” the previous owners render crack “repairs”. I’ll put crack repairs in another post.
This section is by far the biggest wall and I’m looking forward to hitting it with colour, but I need to fix the render cracks first.
Photo shows completed Section 2 (alcove near kitchen), and lower part of Section 3 painted with top coat. The very far end is not yet primed but you can hardly see that in the picture.
.
.
.
.